Bridge over Lörbäcken

Completed
Client:
BDX Företagen AB
Location:
Vibbyn
Period:
2013-07-15--

About the project

Description

Due to very poor ground conditions a temporary by-pass sank into the clay and the need for a temporary bridge with longer span was imminent. The bridge was launched sideways du to the limited size of cranes that could be used.

Our mission

Rental, erection and dismantling

Facts

Span: 34m

Width: 7 m

Loading: Bk1