Museumsveien Spitsbergen

Completed
Client:
Longyearbyen Lokalstyre
Location:
Longyearbyen, Svalbard
Period:
2014

About the project

Description

Due to floods in the summer of 2013, the bridge on Museumsveien was washed away. The decision was made to replace the bridge with a single lane modular bridge where the Unibridge system was choosen.

Our mission

Supply of bridge equipment. Technical assistance.

Facts

Span: 40.3m

Width: 4.0m + 1.2m footwalk

Loading: BK 10/60, 80 years fatigue life