Overbridge Skateholm

Completed
Client:
Trafikverket
Location:
Skateholm
Period:
2013-03--

About the project

Description
Due to settlements in the ballast wall a quick solution was needed to avoid road closure. The answer was a quickly assembled overbridge with ramps on top of the existing structure.

Our mission
Planning, erection and rental of equipment

Facts
Span: 12m
Width: 3.45m
Loading: Bk1